Schedule of Churchgate-Borivali Slow Local

From: ADH Andheri
To: BYR Bhayandar
Departs @ 15:36
Arrive @ 16:08
Platform# --
Platform# --
S
M
T
W
T
F
S
S
M
T
W
T
F
S
Type: EMU - Mumbai
Zone:WR/Western
Travel Time: 0h 32m
3 halts
Distance: 22 km
Avg Speed: 40 km/hr
Peak Speed: NA
From: NA
To: NA

Train Route of Churchgate-Borivali Slow Local

CodeStation NameArrivesDepartsPFHaltDay
ADHAndheriStart15:36--1
BVIBorivali15:5115:52--1m1
DICDahisar15:5615:57--1m1
MIRAMira Road16:0116:02--1m1
BYRBhayandar16:08End--1

Coach Postion of Churchgate-Borivali Slow Local

Alternet Trains of Churchgate-Borivali Slow Local

TrainTrain NameSMTWTFS
59045Mumbai Bandra T-Vapi PassengerSMTWTFS
93103Churchgate - Dahanu Road Fast LocalSMTWTFS

Return Train from Andheri to Bhayandar

TrainTrain NameSMTWTFS
93108Dahanu Road - Dadar Fast LocalSMTWTFS
93112Dahanu Road - Churchgate Fast LocalSMTWTFS

Frequently Asked Questions for Churchgate-Borivali Slow Local

1: What is the train number of Churchgate-Borivali Slow Local?

A: Churchgate-Borivali Slow Local Train Number is 90675.

2: What is the Schedule of Churchgate-Borivali Slow Local?

A: Churchgate-Borivali Slow Local train runs from Andheri to Bhayandar. It departs from Andheri at 15:36 and reaches Bhayandar at 16:08.

3: What is the platform number of Churchgate-Borivali Slow Local or on which platform the train usually arrives?

A: Train 90675 arrives on platform number -- at Andheri and at platform number -- at .Bhayandar

4: What is the travel route and time of Churchgate-Borivali Slow Local?

A: Churchgate-Borivali Slow Local took 0h 32m to cover total distance of 22 km between Andheri and Bhayandar. The average speed of Churchgate-Borivali Slow Local is 40 km/hr with a peak speed of NA

5: How many total halts Churchgate-Borivali Slow Local has on its journey?

A: Churchgate-Borivali Slow Local took total 3 halts to cover its journey.

6: From where Churchgate-Borivali Slow Local starts and at which time? Or What is the source station of Churchgate-Borivali Slow Local?

A: Churchgate-Borivali Slow Local starts from Andheri at 15:36 at Platform number --.

7: What is the last station of Churchgate-Borivali Slow Local and when the train reaches to its destination?

A: Its reaches Bhayandar at 16:08 which is the last station of its journey.

Related Tags

Churchgate-Borivali Slow Local train route, Churchgate-Borivali Slow Local train time table, Churchgate-Borivali Slow Local train schedule, Churchgate-Borivali Slow Local coach position, 90675 train route, 90675 train time table, 90675 train schedule, 90675 coach position, 90675 Stations, 90675 platform number, 90675 train platform. Also you will know train route from Andheri to Bhayandar, train schedule from Andheri to Bhayandar, train time table from Andheri to Bhayandar.